| Origin | Destination | Cost Idx | Status | Lead Time | Mode | Volume | Last Reviewed |
|---|---|---|---|---|---|---|---|
| Shanghai, CN | Plant 02, DE | 1.00 | Optimized | 32 days | Ocean | 1,240 TEU/yr | Jun 2026 |
| Rotterdam, NL | Plant 02, DE | 0.92 | Optimized | 2 days | Truck | 860 TEU/yr | Jun 2026 |
| Monterrey, MX | DC East, US | 1.34 | Needs redesign | 9 days | Rail | 410 TEU/yr | Mar 2026 |
| Stuttgart, DE | Plant 02, DE | 0.88 | Optimized | 1 day | Truck | 1,580 TEU/yr | Jun 2026 |
| Ho Chi Minh, VN | Plant 07, MX | 1.42 | Needs redesign | 36 days | Ocean | 295 TEU/yr | Feb 2026 |
| Katowice, PL | Plant 02, DE | 1.05 | Under review | 5 days | Intermodal | 540 TEU/yr | May 2026 |
Manufacturers that trust us








25 USE CASES, ZERO GUESSWORK
Every place cost hides in a manufacturing network.
Browse all 25. When you’re ready, tell Divya which ones to dig into.

Divya Gautam
1 OF 25 USE CASES
A tailor-made solution, already delivered.
From a network nobody had fully mapped to a ranked list of redesign opportunities — here’s the path, and the proof.
Weeks → Days
Network redesign scans now take days instead of a quarter of analyst time.
THE STARTING POINT
Network decisions relied on outdated assumptions, with lanes, hubs, and suppliers added over time without a clear view of current freight flows.
18-32%
Transport cost savings on flagged lanes, increasing with full network redesign.
HOW WE DID IT
Mapped every lane against live ERP, TMS, and supplier data — origin to hub to destination, ranked by cost and redesign priority.
Full Network
Every lane traced and scored, not just the handful of known problem routes.
THE IMPACT
Costly and single-sourced lanes are now flagged automatically — freeing the team to act on the redesign instead of hunting for it.

Divya Gautam
Industrial Supply Chain Expert
HOW IT WORKS
One hour away from guaranteed cost savings.
A structured process – no surprises. You know exactly what happens at every stage.
Book a 1-hour call
No preparation needed. We ask the right questions to understand your network, pain points and data landscape.
Identify savings areas
We map your operation against all 25 initiatives and tell you exactly which apply and what they are worth.
You see the numbers
By lane, by depot, live. Every loss identified, ranked by size, with a concrete action attached.
Guaranteed results
6–12 month engagement. We guarantee the savings. You pay based on results — not on time spent.
Scale & extend
Once one area is optimised, we move to the next. The 25 initiatives become a roadmap, not a one-off project.
WHO YOU’LL MEET IN THE PROCESS
Real experts that care.
Every engagement is run by people who have worked inside logistics networks and built the software that optimizes them.
One call. Zero commitment.
Real clarity.
Talk to Divya directly. In a short call, you will know exactly where to move to identify where your costs are bleeding, and how much you can get back.

Divya Gautam

Schwandweg 5, Schindellegi
Switzerland 8834
Tel: +41 41 560 03 99
support@log-hub.com
Products and Services
Supply Chain Apps
Network Design Simulator
Log-hub Platform
Data Analytics and AI Consulting
Quick links
See how our apps work
Log in
Resources
About us
Privacy policy
